Informationsmanagement Abrechnungsdaten Produktionsplanung Produktionsdaten Ablaufplanung Stapelung Planung des 3D-Fertigteilmodells Planung des 3D-Angebotsmodells Automatische Informationsflüsse – Mobil – Dashboards Training – Consulting – Support E

Creating

long-lasting

structures

Creating

long-lasting

structures

The best for the best

On the cutting-edge – with industrialised construction

We are convinced that precast construction is the solution to the challenges of our time. Together it is our duty to create high-quality living spaces for the world’s rapidly growing population in a resource-efficient way. Cost and time pressure, along with constantly increasing requirements in terms of quality, characterise the industry.

And this is exactly where precast construction has the advantage: creating especially high-quality, long-lasting structures in a short amount of time. At Allplan Precast, we have passionately shaped the world of industrialized construction for more than 30 years. Our single focus on the precast concrete industry and our tireless spirit of innovation have helped us become the global market leader.

Precast construction is smart

The precast construction industry is stronger than ever and ensures high quality. Precast concrete factories, engineering and planning offices, and universities and training centers benefit from our solutions. Allplan Precast revolutionises the manufacturing process from start to finish: from constructing residential buildings, offices, sports and industrial halls, cultural venues, agricultural buildings, hospitals and universities, to production facilities or commercial spaces – we give our customers the greatest efficiency with shortened project lead times and increased quality. When you work with Allplan Precast, your competitive edge also grows.

The 6 biggest advantages of a precast concrete construction system are: 

  • Durability
  • Eco-friendliness
  • Efficiency
  • Sustainability
  • Precision
  • Time savings
This is the key

Construction projects are becoming more and more complex: more parties involved, more costs, more time pressure. The entire industry is challenged and relies on the best partners and solutions the market has to offer. Allplan Precast has the best tools for planning and executing your precast concrete projects.

Planbar

CAD for industrialised construction

  • Automated Workflows for more efficiency
  • Reinforcement and shop drawings at the push of a button
  • 3D is as easy as 2D
Learn more
Tim|work

Operations scheduling and BIM management

  • 3D functions for better clarity
  • Direct access to all project information
  • Quality assured data for ERP and MES
Learn more
Tim|flow

Data hub

  • Automated flow of information between ERP-CAD-MES saves time
  • Mobile app for optimised assembly
  • Dashboards for better decision-making
Learn more
Customer Excellence Services

Consulting, training, support

  • Customized training for greater expertise
  • Quick assistance with software questions
  • Greater speed thanks to process and IT system optimisations
Learn more
Our customers are proud of their work
Its intelligence in providing precast solutions meets the company’s objective. Thanks to its reliability and flexibility, last-ditch modification in precast elements is achievable.
Thoo Hoi Hian, Head of Design (GIBS), GAMUDA
Perfect model-based work preparation with Tim  

Tim allows us to perform model-based production planning and provides us with all of the information about products, components and processes at any time. At the same time, Tim also visualises all of the contents and provides data for production and the ERP-system in an optimised form.
Karsten Rewitz, CEO, Contiga A/S
Customised software solutions and optimal support 

Planbar has been able to provide a detailing platform that has the software customisation capabilities and the support staff necessary to allow for a customised solution to a specialty product-line.
Bryant A. Zavitz, VP Product & Process Development, Tindall Corporation
Unmistakably the best partner in the precast industry  

Allplan Precast has extensive abilities to modify preferences adapted to our production process. Our customized solution created more detailed reinforcement schedules adapted to our production and customer needs.
Jan Cloet, Bouwonderneming Christiaens, Project Planner
Contact us
Where is precast construction used?

Precast concrete construction is part of our modern life. From single-family homes to modern apartment buildings or public buildings – Allplan Precast plays a role in many types of buildings. Our solutions bring greater efficiency to the world of construction.

  • Residential buildings
  • Schools and educational institutions
  • Religious buildings, cemeteries
  • Hospitals and healthcare buildings
  • Cultural venues
  • Sports parks
  • Restaurants and entertainment venues
  • Hotels and accommodations
  • Public and private administrative buildings
  • Public safety buildings
  • Commercial spaces
  • Agricultural, forestry, veterinary and animal care buildings
  • Industrial structures
  • Utilities & waste management buildings
  • Hydraulic structures
Flagship projects in precast construction

Allplan Precast is your partner for success: more than 380 precast concrete factories and engineering offices trust our software solutions.

Precast concrete construction creates greater added value 

Creating solutions for the design and planning of precast concrete buildings is our passion. A look at the history of precast construction shows that modern precast construction dates back to the beginning of the 20th century. Architectural greats and pioneers such as Le Corbusier or John Brodie influenced the design of many world-famous buildings: the spectacular Sydney Opera House in Australia and the Lotus Temple in India, for example. Our everyday lives are surrounded by functional buildings: from schools to residential buildings and so much more. Increasingly, companies in the construction industry are recognising and making use of all the advantages prefabrication has to offer.

our references
© (c) FH Salzburg/Neumayr/Masser

Allianz Stadion in Vienna, Austria

This marvel of industrialised construction took only 17 months to build. Elaborate geometries required special precast construction. The shell was ready after 7 months – record time. Oberndorfer’s high level of expertise and our Planbar software solution made this all possible. Intelligent and automated planning ensured maximum precision and error-free, efficient work.

watch Video
© SK Rapid Wien